NJWB April 29th, 2024
Berkeley Township MUA Water Tower Rehab
The Berkeley Township MUA recently closed on a $1,516,263 loan with the NJ Water Bank to rehabilitate and repaint the 1.0-million-gallon Northern Boulevard Water Storage Tank. The coating systems on the tank have reached the end of their useful life and need to be replaced.The project includes the r