June 24th, 2021 NJIB
ALLENTOWN BOROUGH LOAN CLOSING 004Allentown Borough recently closed on a $1,909,800 loan with the New Jersey Water Bank for site improvements to the water treatment plant. The plant ha...
Read MoreJune 23rd, 2021 NJIB
ORANGE CITY WELL 5Orange City Township recently closed on a $750,000 loan with the New Jersey Water Bank to reactivate its existing Well #5 located within the South Mou...
Read MoreJune 23rd, 2021 NJIB
BRIELLE BOROUGH LOAN CLOSING 004The Brielle Borough MUA recently closed on a $1,677,600 loan with the New Jersey Water Bank to Rehabilitate the Borough's 500,000-gallon steel ground ...
Read MoreJune 23rd, 2021 NJIB
BRIELLE BOROUGH 005 LOAN CLOSINGThe Brielle Borough MUA recently closed on a $3,532,900 loan with the New Jersey Water Bank to Design and construct a new 300,000-gallon elevated water storage tank in the Borough of Brielle at the Ol...
June 17th, 2021 NJIB
OLD BRIDGE MUA LOAN CLOSINGThe Old Bridge MUA recently closed on a $1,723,970 loan with the New Jersey Water Bank to Rehabilitate part of the Authority's Water Distribution System. Many of the 2- and 4-inch cast iron mains...
June 11th, 2021 NJIB
WENONAH BOROUGH LOAN CLOSINGThe Borough of Wenonah recently closed on a $93,975 loan with the New Jersey Water Bank to design and implement an Asset Management Plan for the Sanitary Sewer Collection System.The Borough of Wenonah...
June 11th, 2021 NJIB
LOWER TOWNSHIP MUA DEL HAVEN WATER MAIN EXTENSIONThe Lower Township MUA recently closed on a $8,500,00 loan with the New Jersey Water Bank for the expansion of its drinking water system north of Lower Township into the community of Del Haven and par...
June 9th, 2021 NJIB
SUSSEX COUNTY MUA LANDFILL EXPANSION LOAN CLOSINGThe Sussex County Municipal Utilities Authority (SCMUA) recently closed on a $27,181,599 loan with the New Jersey Water Bank for a landfill expansion project. The SCMUA proposes several improvements a...
April 30th, 2021 NJIB
BAYONNE CITY LOAN CLOSINGBayonne City recently closed on a $1,618,539 loan with the NJ Water Bank for stormwater management facilities and Francis G. Fitzpatrick Park improvements.Sanitary sewer and stormwater runoff for...
April 23rd, 2021 NJIB
TWO RIVERS WATER RECLAMATION AUTHORITY INTERCEPTOR AND PUMP STATION IMPROVEMENTSTwo Rivers Water Reclamation Authority (TRWRA) recently closed on a $4,000,000 loan with the NJ Water Bank to improve its collection system and pumping infrastructure. Interceptor Rehabilitation inclu...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600