June 28th, 2021 NJIB
SEASIDE PARK BOROUGH LOANSeaside Park Borough recently closed on a $1 Million loan with the New Jersey Water Bank for water quality improvements. The project consists of the i...
Read MoreJune 28th, 2021 NJIB
BRICK TOWNSHIP MUA SANITARY SEWER MAIN LOAN CLOSINGThe Brick Township MUA recently closed on a $4,041,432 loan with the New Jersey Water Bank for a sanitary sewer main replacement. This project wa...
Read MoreJune 28th, 2021 NJIB
BRICK TOWNSHIP MUA 008 LOAN CLOSINGThe Brick Township MUA recently closed on a $5,442,253 loan with the New Jersey Water Bank to replace undersized water mains in Cedar Park East and We...
Read MoreJune 28th, 2021 NJIB
BRICK TOWNSHIP MUP 014 LOAN CLOSINGThe Brick Township MUA recently closed on a $2,092,402 loan with the New Jersey Water Bank for a water main replacement. The existing water main within the project area is prone to breaks and suscepti...
June 25th, 2021 NJIB
TUCKERTON KINGFISHER LOAN CLOSINGTuckerton Borough recently closed on a $1,209,890 loan with the New Jersey Water Bank to replace deteriorated asbestos water mains with PVC water mains. Valves, fire hydrants and water services will b...
June 25th, 2021 NJIB
HIGHTSTOWN BOROUGH 010 LOANHightstown Borough recently closed on a $1,433,796 loan with the New Jersey Water Bank for Water Main Improvements. The 4-inch water main on First Avenue between Center Street and Outcalt Street ...
June 25th, 2021 NJIB
FARMINGDALE BOROUGH LOAN CLOSINGFarmingdale Borough recently closed on a $522,893 loan with the New Jersey Water Bank to paint and repair its water tower. The Borough of Farmingdale is currently operating a 125,000-gallon water elev...
June 25th, 2021 NJIB
PERTH AMBOY LOAN CLOSINGThe City of Perth Amboy recently closed on a $1,651,532 loan with the New Jersey Water Bank to paint the backwash tank at the water treatment plant and to provide standpipe maintenance repairs in the ...
June 24th, 2021 NJIB
OLD BRIDGE MUA LOAN CLOSINGThe Old Bridge MUA recently closed on a $2,700,000 loan with the New Jersey Water Bank to Rehabilitate part of the Authority's Water Distribution System. Many of the 2- and 4-inch cast iron mains...
June 24th, 2021 NJIB
HAMBURG BOROUGH LOAN CLOSINGHamburg Borough recently closed on a $561,016 loan with the New Jersey Water Bank to rehabilitate three water storage tanks. The three cylindrical tanks include one with a 100,000-gallon capacity...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600