June 5th, 2024 NJWB
NATIONAL PARK PFAS TREATMENTNational Park Borough recently completed drinking water improvements that are being financed with approximately $778,370 in loans from the NJ Water Ba...
Read MoreJune 4th, 2024 NJWB
EAST ORANGE CITY WATER SYSTEM IMPROVEMENTSEast Orange City recently closed on a $1,867,413 loan with the NJ Water Bank to increase the efficiency of its water distribution system. The city pro...
Read MoreMay 31st, 2024 NJWB
RIDGEWOOD VILLAGE PFAS REMOVALRidgewood Village recently closed on a $3,882,987 loan with the NJ Water Bank to install new raw water mains to convey water supply from the village w...
Read MoreMay 29th, 2024 NJWB
WILDWOOD CITY CAPITAL IMPROVEMENT PLANWildwood City recently replaced outdated infrastructure capitalizing on savings from three distinct I-Bank financing programs for one project: the drinking water and clean water programs within the Wa...
April 29th, 2024 NJIB
BERKELEY TOWNSHIP MUA WATER TOWER REHABThe Berkeley Township MUA recently closed on a $1,516,263 loan with the NJ Water Bank to rehabilitate and repaint the 1.0-million-gallon Northern Boulevard Water Storage Tank. The coating systems on t...
April 26th, 2024 NJIB
SEASIDE HEIGHTS BOROUGH LOAN CLOSINGThe Seaside Heights Borough Water Treatment Plant ("Borough") recently closed on a $4.5 million loan with the NJ Water Bank to repair electrical system and controls that have been damaged by flooding....
April 8th, 2024 NJIB
UPPER DEERFIELD LOANUpper Deerfield Township recently closed on a $1,938,000 loan with the NJ Water Bank to replace the 250,000-gallon water tower serving Seabrook. The water tower was constructed in 1937 and imposes num...
March 28th, 2024 NJIB
DEPTFORD TOWNSHIP MUA COUNTRY CLUB ESTATES LOAN CLOSINGSThe Deptford Township MUA recently closed on two loans with the NJ Water Bank totaling $2,145,768 for the rehabilitation of water and sewer mains in the Country Club Estates section of Deptford Townsh...
March 28th, 2024 NJIB
DEPTFORD TOWNSHIP MUA EAST WOODBURY LOAN CLOSINGThe Deptford Township MUA recently closed on two loans with the NJ Water Bank totaling $2,491,877 for the rehabilitation of the East Woodbury sanitary sewer and water mains. The mains were constructed...
February 29th, 2024 NJIB
VERONA TOWNSHIP LOAN CLOSINGVerona Township recently closed on a $2,330,613 loan with the NJ Water Bank to upgrade the Linn Drive well treatment facility to address PFAS and arsenic in the water supply. This project will bring t...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600