FILTER BY TAG

NEWS (DRINKING WATER PROJECT)

NATIONAL PARK PFAS TREATMENT

National Park Borough recently completed drinking water improvements that are being financed with approximately $778,370 in loans from the NJ Water Ba...

Read More
EAST ORANGE CITY WATER SYSTEM IMPROVEMENTS

East Orange City recently closed on a $1,867,413 loan with the NJ Water Bank to increase the efficiency of its water distribution system. The city pro...

Read More
RIDGEWOOD VILLAGE PFAS REMOVAL

Ridgewood Village recently closed on a $3,882,987 loan with the NJ Water Bank to install new raw water mains to convey water supply from the village w...

Read More
WILDWOOD CITY CAPITAL IMPROVEMENT PLAN

Wildwood City recently replaced outdated infrastructure capitalizing on savings from three distinct I-Bank financing programs for one project: the drinking water and clean water programs within the Wa...

Read More
BERKELEY TOWNSHIP MUA WATER TOWER REHAB

The Berkeley Township MUA recently closed on a $1,516,263 loan with the NJ Water Bank to rehabilitate and repaint the 1.0-million-gallon Northern Boulevard Water Storage Tank. The coating systems on t...

Read More
SEASIDE HEIGHTS BOROUGH LOAN CLOSING

The Seaside Heights Borough Water Treatment Plant ("Borough") recently closed on a $4.5 million loan with the NJ Water Bank to repair electrical system and controls that have been damaged by flooding....

Read More
UPPER DEERFIELD LOAN

Upper Deerfield Township recently closed on a $1,938,000 loan with the NJ Water Bank to replace the 250,000-gallon water tower serving Seabrook. The water tower was constructed in 1937 and imposes num...

Read More
DEPTFORD TOWNSHIP MUA COUNTRY CLUB ESTATES LOAN CLOSINGS

The Deptford Township MUA recently closed on two loans with the NJ Water Bank totaling $2,145,768 for the rehabilitation of water and sewer mains in the Country Club Estates section of Deptford Townsh...

Read More
DEPTFORD TOWNSHIP MUA EAST WOODBURY LOAN CLOSING

The Deptford Township MUA recently closed on two loans with the NJ Water Bank totaling $2,491,877 for the rehabilitation of the East Woodbury sanitary sewer and water mains. The mains were constructed...

Read More
VERONA TOWNSHIP LOAN CLOSING

Verona Township recently closed on a $2,330,613 loan with the NJ Water Bank to upgrade the Linn Drive well treatment facility to address PFAS and arsenic in the water supply. This project will bring t...

Read More
1 2 3 4 5
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK