September 27th, 2023 NJIB
WOODBINE BOROUGH WTP UPGRADES AND WATER MAIN EXTENSIONWoodbine Borough recently completed drinking water improvements that are being financed with approximately $1.1 million in loans from the NJ Water Ban...
Read MoreSeptember 13th, 2023 NJIB
HOBOKEN CITY WATER MAIN UPGRADESHoboken City recently completed drinking water improvements that are being financed with approximately $6 million in loans from the NJ Water Bank, a l...
Read MoreSeptember 11th, 2023 NJIB
HAWTHORNE BOROUGH WATER UTILITY PFAS TREATMENTHawthorne Borough recently closed on a $5,000,000 loan with the NJ Water Bank to address excessive levels of per- and polyfluoroalkyl substances ("PFA...
Read MoreJuly 21st, 2023 NJIB
US EPA CREATES A RESILIENT WATER UTILITIES INITIATIVEClimate change poses significant challenges to drinking water, wastewater, and stormwater (water sector) utilities in fulfilling their public and environmental health missions. EPA's Creating Res...
July 7th, 2023 NJIB
SHORE WATER COMPANY TANK PAINTING AND REPAIRShore Water Company recently closed on a $20,000,000 loan with the NJ Water Bank to repaint its 75,000-gallon elevated water storage tank inside and out. The tank provides potable water service throug...
July 6th, 2023 NJIB
ROBBINSVILLE TOWNSHIP LOANRobbinsville Township recently closed on a $1,460,608 loan with the NJ Water Bank to address issues with the Newtown Village water distribution system. The township recently acquired the Newtown Villa...
July 6th, 2023 NJIB
ESSEX FELLS BOROUGH PFAS TREATMENT LOANEssex Fells Borough recently closed on a $5,400,000 loan with the NJ Water Bank to address excessive levels of PFAS and PFOS. This group of chemicals is commonly used in a wide range of industria...
June 30th, 2023 NJIB
HO-HO-KUS PFAS WATER TREATMENT SYSTEMHo-Ho-Kus Borough recently closed on a $3,700,000 loan with the NJ Water Bank to address excessive levels of PFAS and PFOS that can penetrate the water supply and affect drinking water quality. This p...
June 30th, 2023 NJIB
STONE HARBOR BOROUGH WATER MAIN REPLACEMENTStone Harbor Borough recently closed on a $5,943,971 loan with the NJ Water Bank for the replacement of approximately 12,640 linear feet (LF) of undersized and deteriorating 6- and 8-inch diameter asb...
June 30th, 2023 NJIB
RED BANK BOROUGH LEAD SERVICE LINE REPLACEMENTRed Bank Borough recently closed on an $3,241,647 loan with the NJ Water Bank to identify and replace lead service lines within the borough. The borough aims to identify all unknown service lines by t...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600