February 29th, 2024 NJIB
LAKEWOOD TOWNSHIP MUA GAC FILTER LOANLakewood Township MUA ("LTMUA") recently closed on a $12,060,4218 loan with the NJ Water Bank to address excessive levels of PFOS. This group of ...
Read MoreFebruary 7th, 2024 NJIB
LAKE STOCKHOLM SYSTEMS, INC. PFAS/PFOS REMOVALLake Stockholm Systems, Inc., recently closed on a $1,687,832 loan with the NJ Water Bank to address excessive levels of per- and polyfluoroalkyl...
Read MoreNovember 17th, 2023 NJIB
CAMDEN CITY PFAS TREATMENT IMPROVEMENTS AT MORRIS-DELAIR WATER TREATMENT PLANTThe City of Camden recently closed on a $55,000,000 loan with the NJ Water Bank to upgrade its Morris Delair potable drinking water treatment facility...
Read MoreOctober 9th, 2023 NJIB
BELLEVILLE TOWNSHIP LEAD SERVICE LINE REPLACEMENTBelleville Township recently closed on a $2,592,243 loan with the NJ Water Bank for Phase 1 of its lead service line replacement program. The project includes the replacement of 430 lead service lines...
September 27th, 2023 NJIB
WOODBINE BOROUGH WTP UPGRADES AND WATER MAIN EXTENSIONWoodbine Borough recently completed drinking water improvements that are being financed with approximately $1.1 million in loans from the NJ Water Bank, a low-rate funding program jointly administered...
September 13th, 2023 NJIB
HOBOKEN CITY WATER MAIN UPGRADESHoboken City recently completed drinking water improvements that are being financed with approximately $6 million in loans from the NJ Water Bank, a low-rate funding program jointly administered by th...
September 11th, 2023 NJIB
HAWTHORNE BOROUGH WATER UTILITY PFAS TREATMENTHawthorne Borough recently closed on a $5,000,000 loan with the NJ Water Bank to address excessive levels of per- and polyfluoroalkyl substances ("PFAS"). This group of chemicals is commonly used in a...
July 21st, 2023 NJIB
US EPA CREATES A RESILIENT WATER UTILITIES INITIATIVEClimate change poses significant challenges to drinking water, wastewater, and stormwater (water sector) utilities in fulfilling their public and environmental health missions. EPA's Creating Res...
July 7th, 2023 NJIB
SHORE WATER COMPANY TANK PAINTING AND REPAIRShore Water Company recently closed on a $20,000,000 loan with the NJ Water Bank to repaint its 75,000-gallon elevated water storage tank inside and out. The tank provides potable water service throug...
July 6th, 2023 NJIB
ESSEX FELLS BOROUGH PFAS TREATMENT LOANEssex Fells Borough recently closed on a $5,400,000 loan with the NJ Water Bank to address excessive levels of PFAS and PFOS. This group of chemicals is commonly used in a wide range of industria...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600