FILTER BY TAG

NEWS (DRINKING WATER PROJECT)

HIGHTSTOWN BOROUGH IMPROVEMENTS TO HAUSSER AVENUE, BENNETT PLACE AND PROSPECT DRIVE

Hightstown Borough recently closed on a $470,908 loan with the NJ Water Bank to Replace six-inch water mains and fire hydrants on Hausser Avenue, Benn...

Read More
NJ PLANNING & REDEVELOPMENT CONFERENCE 2023

Speakers: Diane Schrauth, Policy Director, Water, New Jersey Future Judy Karp, Assistant Director and Legal and Compliance Officer, New Jers...

Read More
LAVALLETTE BOROUGH POTABLE WATER SUPPLY REPLACEMENT

Lavallette Borough recently closed on a $3,700,000 loan with the NJ Water Bank to drill a replacement for Well #3 which was originally drilled in 1948...

Read More
NEW JERSEY AMERICAN WATER EMERGENCY GENERATOR

New Jersey American Water recently completed drinking water improvements that are being financed with approximately $13.9 million in loans from the NJ Water Bank, a low-rate funding program jointly ad...

Read More
CLINTON TOWN SYSTEM-WIDE METER REPLACEMENT

Clinton Town recently completed water quality improvements that are being financed with $602,469 in loans from the NJ Water Bank, a low-rate funding program jointly administered by the DEP and the NJ ...

Read More
LIVINGSTON TOWNSHIP LOAN CLOSING

Livingston Township recently closed on three loans with the NJ Water Bank totaling $83,700,000 for the construction of a new PFAS and Dioxane treatment facility to treat the flows from 11 existin...

Read More
WILLINGBORO MUA PFOS TREATMENT SYSTEM UPGRADE LOAN CLOSING

The Willingboro MUA recently closed on a $6,561,021 loan with the New Jersey Water Bank to upgrade its 2.0 MGD water treatment plant to remove PFOS/PFAS from Well 5A raw water. The upgrade will i...

Read More
ORANGE CITY WELL 5 REHABILITATION

Orange City Township recently closed on a $700,000 loan with the New Jersey Water Bank to reactivate its existing Well #5 located within the South Mountain Reservation in Millburn Township. Proposed i...

Read More
1 2 3 4
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK