FILTER BY TAG

NEWS (NJDEP)

NJ AMERICAN WATER LOAN CLOSING

NJ American Water recently closed on a $8,974,000 loan with the New Jersey Water Bank to replace approximately 1,750 lead service lines with copper se...

Read More
SEASIDE PARK BOROUGH LOAN

Seaside Park Borough recently closed on a $1 Million loan with the New Jersey Water Bank for water quality improvements. The project consists of the i...

Read More
BRICK TOWNSHIP MUA SANITARY SEWER MAIN LOAN CLOSING

The Brick Township MUA recently closed on a $4,041,432 loan with the New Jersey Water Bank for a sanitary sewer main replacement. This project wa...

Read More
BRICK TOWNSHIP MUA 008 LOAN CLOSING

The Brick Township MUA recently closed on a $5,442,253 loan with the New Jersey Water Bank to replace undersized water mains in Cedar Park East and West.The existing 2- to 3-inch water mains were inst...

Read More
BRICK TOWNSHIP MUP 014 LOAN CLOSING

The Brick Township MUA recently closed on a $2,092,402 loan with the New Jersey Water Bank for a water main replacement. The existing water main within the project area is prone to breaks and suscepti...

Read More
HIGHTSTOWN BOROUGH 010 LOAN

Hightstown Borough recently closed on a $1,433,796 loan with the New Jersey Water Bank for Water Main Improvements. The 4-inch water main on First Avenue between Center Street and Outcalt Street ...

Read More
FARMINGDALE BOROUGH LOAN CLOSING

Farmingdale Borough recently closed on a $522,893 loan with the New Jersey Water Bank to paint and repair its water tower. The Borough of Farmingdale is currently operating a 125,000-gallon water elev...

Read More
PERTH AMBOY LOAN CLOSING

The City of Perth Amboy recently closed on a $1,651,532 loan with the New Jersey Water Bank to paint the backwash tank at the water treatment plant and to provide standpipe maintenance repairs in the ...

Read More
OLD BRIDGE MUA LOAN CLOSING

The Old Bridge MUA recently closed on a $2,700,000 loan with the New Jersey Water Bank to Rehabilitate part of the Authority's Water Distribution System. Many of the 2- and 4-inch cast iron mains...

Read More
ORANGE CITY WELL 5

Orange City Township recently closed on a $750,000 loan with the New Jersey Water Bank to reactivate its existing Well #5 located within the South Mountain Reservation in Millburn Township. Proposed i...

Read More
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK