NJWB June 1st, 2023
LAVALLETTE BOROUGH POTABLE WATER SUPPLY REPLACEMENT
Lavallette Borough recently closed on a $3,700,000 loan with the NJ Water Bank to drill a replacement for Well #3 which was originally drilled in 1948 and is currently operating at a reduced capacity. The electrical system was obsolete when it was damaged by Superstorm Sandy and replacement parts are no longer available. Because these system components are needed to meet the Borough water supply needs, the existing electrical system serving Wells # 3 & 5 and the Water Plant will be replaced. Well #5 will also be redeveloped to prevent potential future water-quality issues.
For more information, contact the New Jersey Infrastructure Bank at (609) 219-8600.
Like us on
Facebook
and connect with us on
LinkedIn.