October 2nd, 2023 NJIB
NJ CHAMP PROGRAMIn a major initiative to aid in the protection of New Jersey's public infrastructure, legislation was enacted in the spring of 2023 that expanded the ...
Read MoreNovember 29th, 2023 NJIB
HOBOKEN CITY SINATRA DRIVE REDESIGNHoboken City recently closed on a $6,388,267 loan with the NJ Transportation Bank to redesign Sinatra Drive. The project will improve pedestrian safet...
Read MoreNovember 17th, 2023 NJIB
CAMDEN CITY PFAS TREATMENT IMPROVEMENTS AT MORRIS-DELAIR WATER TREATMENT PLANTThe City of Camden recently closed on a $55,000,000 loan with the NJ Water Bank to upgrade its Morris Delair potable drinking water treatment facility...
Read MoreNovember 16th, 2023 NJIB
OCEAN COUNTY UTILITIES AUTHORITY LOAN CLOSINGThe Ocean County Utilities Authority recently closed on a $2,210,039 loan with the NJ Water Bank to upgrade components at the Southern Water Pollution Control Facility. In 1988, an 85-foot diameter se...
November 15th, 2023 NJIB
RUNNEMEDE SANITARY SEWER EXTENSION AND PUMP STATIONRunnemede Borough recently closed on a $3,324,464 loan with the NJ Water Bank to provide wastewater conveyance for approximately 94 residences. Properties on Davis, Evergreen, Sunnybrook, and Sunset R...
November 10th, 2023 NJIB
JMEUC BIOSOLIDS FACILITY PUMP STATIONThe Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a $10,775,000 loan with the NJ Water Bank to construct the Biosolids Facility Storm Water Pump Station. The work prop...
November 9th, 2023 NJIB
JMEUC BIOSOLIDS FACILITY SITE WALLThe Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a $28,380,000 loan with the NJ Water Bank to construct reinforced flood walls around the biosolids facility. The inst...
November 1st, 2023 NJIB
ORANGE CITY ROADWAY IMPROVEMENTSThe City of Orange Township recently completed roadway improvements that are being financed with approximately $8.6 million in loans from the NJ Transportation Bank, a low-rate funding program adminis...
October 25th, 2023 NJIB
STAFFORD TOWNSHIP BEACH HAVEN WEST SANITARY SEWER REHABStafford Township recently completed clean water improvements that are being financed with approximately $3 million in loans from the NJ Water Bank, a low-rate funding program jointly administered by ...
October 19th, 2023 NJIB
NORTH BRUNSWICK TOWNSHIP SANITARY SEWER IMPROVEMENTSNorth Brunswick Township recently closed on a $2,828,349 loan with the NJ Water Bank to replace the sanitary sewer main along Livingston Avenue. The existing sanitary sewer mains consist of 8- and I0-...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600