September 3rd, 2021 NJIB
PVSC DECANT FACILITY IMPROVEMENTS LOAN CLOSINGThe Passaic Valley Sewerage Commission recently closed on a $64,825,879 loan with the New Jersey Water Bank to rehabilitate its Decant facility includ...
Read MoreAugust 23rd, 2021 NJIB
BERKELEY TOWNSHIP SA BAYVIEW AVENUE FORCE MAIN REPLACEMENTThe Berkeley Township Sewerage Authority closed on a $2,911,031 loan with the New Jersey Water Bank to replace the Bayview Avenue Force Main. The...
Read MoreJuly 29th, 2021 NJIB
BERGEN COUNTY UA LOAN CLOSINGThe Bergen County Utilities Authority recently closed on a $57,000,000 loan with the New Jersey Water Bank to protect the plant and high value power s...
Read MoreJuly 29th, 2021 NJIB
POINT PLEASANT LOAN CLOSINGPoint Pleasant Beach Borough recently closed on a $2,540,000 loan with the New Jersey Water Bank for a water main replacement on Ocean Avenue which is believed to have been installed in 1924. In accor...
July 7th, 2021 NJIB
TRENTON CITY LSLR LOANThe City of Trenton recently closed on a $25,000,000 loan with the New Jersey Water Bank to eliminate lead in drinking water. The project includes the verification and replacement of lead service line...
July 7th, 2021 NJIB
SEASIDE PARK BOROUGH AMP LOAN CLOSINGSeaside Park Borough recently closed on a $70,200 loan with the New Jersey Water Bank for the completion of a water utility asset management plan (AMP). The AMP includes the five following object...
July 6th, 2021 NJIB
JCMUA LOAN CLOSING 18The Jersey City MUA recently closed on a $10,000,000 loan with the New Jersey Water Bank to replace approximately 5,300 linear feet of 6â€"8-inch diameter water main with 16-inch diameter ceme...
July 6th, 2021 NJIB
JCMUA LOAN 20The Jersey City MUA recently closed on a $5,587,978 loan with the New Jersey Water Bank to replace approximately 9,120 linear feet of 6-inch cast iron water distribution mains with new eight-inch diam...
June 30th, 2021 NJIB
CLINTON TOWN FOSTER WHEELER LOANClinton Town recently closed on a $1,200,000 loan with the New Jersey Water Bank to upgrade the Foster Wheeler and Fox Fire Booster Pump Stations. The existing pump stations are beyond their useful li...
June 30th, 2021 NJIB
SHIP BOTTOM WTP LOAN CLOSINGShip Bottom Borough recently closed on a $9,500,000 loan with the New Jersey Water Bank to replace its only Water Treatment Facility which was damaged by Superstorm Sandy. The plant is over 70 years o...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600