FILTER BY TAG

NEWS (BIL)

JERSEY CITY MUA LEAD SERVICE LINE REPLACEMENT LOAN

The Jersey City MUA recently closed on a $311,040 loan with the NJ Water Bank to replace approximately 16,000 lead service lines between 2022 and 2031...

Read More
TRENTON CITY METER REPLACEMENT AND AMI PROJECT

The City of Trenton recently closed on a $20,000,000 loan with the NJ Water Bank to replace all of Trenton Water Works water meters with advanced mete...

Read More
RIDGEWOOD VILLAGE WATER TREATMENT CENTRALIZATION FOR PFAS REMOVAL

Ridgewood Village recently closed on a $10,762,338 loan with the NJ Water Bank to address excessive levels of PFAS, commonly used in a wide range...

Read More
REHABILITATION OF COMBINED AND STORM SEWER OUTFALLS

Camden City recently closed on a $2,175,071 loan with the NJ Water Bank for the maintenance and rehabilitation of twelve combined sewer outfalls and seven separate stormwater sewer outfalls to restore...

Read More
TUCKERTON BOROUGH REHABILITATION OF WELL NUMBERS 3 AND 4

Tuckerton Borough recently closed on a $249,568 loan with the NJ Water Bank to rehabilitate Well numbers 3 and 4. The project includes clearing iron buildup in well casings and screens, removing sedim...

Read More
MERCHANTVILLE PENNSAUKEN WATER COMMISSION PFAS TREATMENT LOAN

The Merchantville Pennsauken Water Commission ("MPWC") recently closed on a $8,110,000 loan with the NJ Water Bank to address excessive levels of PFAS and PFOS at its National Highway PFC Plant.&...

Read More
CAMDEN CITY SEWER REPLACEMENT

Camden City recently closed on a $6,550,000 loan with the NJ Water Bank to rehabilitate several deficient sanitary sewer mains at various locations in the city. The age and poor condition of the syste...

Read More
MONTGOMERY TOWNSHIP STAGE II WASTEWATER TREATMENT PLANT FLOOD PROTECTION PROJECT

Montgomery Township recently closed on a $17 million loan with the NJ Water Bank to protect the wastewater treatment plant from flooding and improve its resiliency. Various plant components will be re...

Read More
NORTH BERGEN TOWNSHIP LOAN CLOSING

North Bergen Township recently closed on a $4,300,000 loan with the NJ Water Bank for hydraulic analysis to determine the pipe size needed to reduce localized flooding on 85th Street. The sanitary lin...

Read More
LIVINGSTON TOWNSHIP LOAN CLOSING

Livingston Township recently closed on three loans with the NJ Water Bank totaling $83,700,000 for the construction of a new PFAS and Dioxane treatment facility to treat the flows from 11 existin...

Read More
1 2 3 4
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK