FILTER BY TAG

NEWS (ASSET MANAGEMENT PLAN)

WOODBINE BOROUGH WTP UPGRADES AND WATER MAIN EXTENSION

Woodbine Borough recently completed drinking water improvements that are being financed with approximately $1.1 million in loans from the NJ Water Ban...

Read More
HADDON HEIGHTS BOROUGH LOAN CLOSING

The Borough of Haddon Heights recently closed on a $471,305 loan with the NJ Water Bank for the preparation of an asset management plan for the boroug...

Read More
HOPEWELL TOWNSHIP LOAN CLOSING

Hopewell Township recently closed on a $122,571 loan with the NJ Water Bank to repair deteriorated sewers. The Hopewell Township Sewer Depar...

Read More
SEASIDE PARK BOROUGH AMP LOAN CLOSING

Seaside Park Borough recently closed on a $70,200 loan with the New Jersey Water Bank for the completion of a water utility asset management plan (AMP). The AMP includes the five following object...

Read More
CLINTON TOWN FOSTER WHEELER LOAN

Clinton Town recently closed on a $1,200,000 loan with the New Jersey Water Bank to upgrade the Foster Wheeler and Fox Fire Booster Pump Stations. The existing pump stations are beyond their useful li...

Read More
CLINTON TOWN WQAA LOAN CLOSING

Clinton Town recently closed on a $1,792,706 loan with the New Jersey Water Bank for geospatial location, inspection, testing, and replacement of approximately 300, 12-inch system valves. Additional v...

Read More
BRICK TOWNSHIP MUA SANITARY SEWER MAIN LOAN CLOSING

The Brick Township MUA recently closed on a $4,041,432 loan with the New Jersey Water Bank for a sanitary sewer main replacement. This project was planned in accordance with the Township's Water ...

Read More
BRICK TOWNSHIP MUP 014 LOAN CLOSING

The Brick Township MUA recently closed on a $2,092,402 loan with the New Jersey Water Bank for a water main replacement. The existing water main within the project area is prone to breaks and suscepti...

Read More
ALLENTOWN BOROUGH LOAN CLOSING 004

Allentown Borough recently closed on a $1,909,800 loan with the New Jersey Water Bank for site improvements to the water treatment plant. The plant has been in continuous use for over 50 years with tw...

Read More
WENONAH BOROUGH LOAN CLOSING

The Borough of Wenonah recently closed on a $93,975 loan with the New Jersey Water Bank to design and implement an Asset Management Plan for the Sanitary Sewer Collection System.The Borough of Wenonah...

Read More
1 2
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK