NJWB June 19th, 2019
WARREN TOWNSHIP SEWERAGE AUTHORITY LOAN CLOSING
Warren Township Sewerage Authority closed earlier this week on a $1,326,822 construction loan with the NJ Water Bank to rehabilitate the Stage I/II sewer collection system to reduce impacts from infiltration and inflow (I/I) and increase the capacity of the Wastewater Treatment Plant. Approximately 11,441 LF of 8-inch and 966 LF of 12-inch sanitary lines are to be rehabilitated using Cured-in-Place Pipe lining. This project also includes the rehabilitation of 5 manholes.
For more information, contact the New Jersey Infrastructure Bank at (609) 219-8600.
Like us on
Facebook
and connect with us on
LinkedIn.