NJWB June 4th, 2024
EAST ORANGE CITY WATER SYSTEM IMPROVEMENTS
East Orange City recently closed on a $1,867,413 loan with the NJ Water Bank to increase the efficiency of its water distribution system. The city proposes to replace its water main and service connection which is necessary to improve water pressure for health and human safety throughout the drinking water system. In addition, the city plans to disinfect the White Oak Ridge Pump Station, replace its generator, and convert from the use of chloride to sodium hypochlorite.
For more information, contact the New Jersey Infrastructure Bank at (609) 219-8600.
Like us on
Facebook
and connect with us on
LinkedIn.