February 6th, 2023 NJIB
The City of Newark recently closed on a $3.8 million loan with the NJ Water Bank for the construction of a floatables control netting facility at the Peddie CSO. The project was designed to replace the existing structure with a more robust facility featuring easier maintenance and a longer service life.
For more information, contact the New Jersey Infrastructure Bank at (609) 219-8600.
Like us on Facebook and connect with us on LinkedIn.
TAGS: Loan Closing Clean Water Project NJDEP 2023 BIL Disadvantaged Community
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600