February 29th, 2024 NJIB
LAKEWOOD TOWNSHIP MUA GAC FILTER LOANLakewood Township MUA ("LTMUA") recently closed on a $12,060,4218 loan with the NJ Water Bank to address excessive levels of PFOS. This group of ...
Read MoreFebruary 29th, 2024 NJIB
VERONA TOWNSHIP LOAN CLOSINGVerona Township recently closed on a $2,330,613 loan with the NJ Water Bank to upgrade the Linn Drive well treatment facility to address PFAS and arse...
Read MoreFebruary 8th, 2024 NJIB
BORDENTOWN CITY WATER METER REPLACEMENTBordentown City recently closed on a $3,005,546 loan with the NJ Water Bank to replace approximately 5,760 flow meters for water supply to residential...
Read MoreFebruary 7th, 2024 NJIB
LAKE STOCKHOLM SYSTEMS, INC. PFAS/PFOS REMOVALLake Stockholm Systems, Inc., recently closed on a $1,687,832 loan with the NJ Water Bank to address excessive levels of per- and polyfluoroalkyl substances ("PFAS"). This group of chemicals is c...
February 1st, 2024 NJIB
MCUA MAIN TRUNK SEWER & METER CHAMBER REHABMiddlesex County Utilities Authority ("MCUA") recently closed on an $26,000,000 loan with the NJ Water Bank to rehabilitate part of the Main Trunk Sewer (MTS) on the north side of the service area. Th...
January 31st, 2024 NJIB
RUTGERS UNIVERSITY RECEIVES $30 MILLION IN WATER BANK LOANS SAVING RATEPAYERS APPROXIMATELY $8.5 MILLION.Rutgers, the State University of New Jersey, recently completed clean water improvements that are being financed with approximately $30 million in loans from the NJ Water Bank, a low-rate funding prog...
January 31st, 2024 NJIB
BRICK TOWNSHIP MUA SANITARY SEWER MANHOLE REPLACEMENTThe Brick Township MUA recently closed on a $7,581,767 loan with the NJ Water Bank to rehabilitate and/or replace 74 sanitary sewer manholes throughout Brick Township. The manholes are showing signs o...
January 26th, 2024 NJIB
PASSAIC VALLEY SEWERAGE COMMISSION CENTRIFUGEPassaic Valley Sewerage Commission ("PVSC") recently closed on a $22,214,031 loan with the NJ Water Bank to purchase and install a fifth centrifuge. Centrifugal thickening and dewatering of sewage slu...
January 25th, 2024 NJIB
MUSCONETCONG SEWERAGE AUTHORITY IMPROVEMENTS LOAN CLOSINGThe Musconetcong Sewerage Authority("MSA") recently closed on a $2,411,067 loan with the NJ Water Bank for improvements to its wastewater treatment plant, including the replacement of the HVAC systems...
January 24th, 2024 NJIB
ELIZABETH CITY SOUTH SECOND STREET DRAINAGE AND ATLANTIC STREET CSO TANK PROJECTElizabeth City recently closed on a $16,500,000 loan with the NJ Water Bank to improve drainage near South Second Street and related improvement at the intersection of Third Avenue and Atlantic Street...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600