June 30th, 2023 NJIB
RED BANK BOROUGH LEAD SERVICE LINE REPLACEMENTRed Bank Borough recently closed on an $3,241,647 loan with the NJ Water Bank to identify and replace lead service lines within the borough. The borou...
Read MoreJune 29th, 2023 NJIB
TRENTON CITY METER REPLACEMENT AND AMI PROJECTThe City of Trenton recently closed on a $20,000,000 loan with the NJ Water Bank to replace all of Trenton Water Works water meters with advanced mete...
Read MoreJune 29th, 2023 NJIB
JERSEY CITY MUA LEAD SERVICE LINE REPLACEMENT LOANThe Jersey City MUA recently closed on a $311,040 loan with the NJ Water Bank to replace approximately 16,000 lead service lines between 2022 and 2031...
Read MoreJune 23rd, 2023 NJIB
TUCKERTON BOROUGH REHABILITATION OF WELL NUMBERS 3 AND 4Tuckerton Borough recently closed on a $249,568 loan with the NJ Water Bank to rehabilitate Well numbers 3 and 4. The project includes clearing iron buildup in well casings and screens, removing sedim...
June 23rd, 2023 NJIB
REHABILITATION OF COMBINED AND STORM SEWER OUTFALLSCamden City recently closed on a $2,175,071 loan with the NJ Water Bank for the maintenance and rehabilitation of twelve combined sewer outfalls and seven separate stormwater sewer outfalls to restore...
May 26th, 2023 NJIB
NORTH BERGEN TOWNSHIP LOAN CLOSINGNorth Bergen Township recently closed on a $4,300,000 loan with the NJ Water Bank for hydraulic analysis to determine the pipe size needed to reduce localized flooding on 85th Street. The sanitary lin...
February 6th, 2023 NJIB
NEWARK CITY PEDDIE CSO IMPROVEMENTSThe City of Newark recently closed on a $3.8 million loan with the NJ Water Bank for the construction of a floatables control netting facility at the Peddie CSO. The project was designed to replace th...
December 12th, 2022 NJIB
HIGHLANDS BOROUGH LOAN CLOSINGHighlands Borough recently closed on an $8,329,712 loan with the NJ Water Bank to improve coastal community water quality. The existing sanitary sewer system in the borough consists of vitrified clay ...
October 31st, 2022 NJIB
PVSC PLANTWIDE SCADA IMPROVEMENTSThe Passaic Valley Sewerage Commission recently closed on a $4,120,254 loan with the NJ Water Bank to implement plantwide SCADA improvements. The work involves replacing existing control equipment tha...
October 10th, 2022 NJIB
SOUTH ORANGE VILLAGE WATER UTILITY ADVANCED METERING INFRASTRUCTURESouth Orange Village recently closed on a $2.7 million loan with the New Jersey Water Bank to implement Advanced Metering Infrastructure (AMI). Because most of the South Orange Village water meters ar...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600