FILTER BY TAG

NEWS (2023)

ATLANTIC CITY MUA WATER METER AND MTU REPLACEMENT

The Atlantic City MUA ("Authority") recently closed on a $1,955,044 loan with the NJ Water Bank to upgrade or replace approximately 6500 Automatic Met...

Read More
CCMUA BAR SCREEN & GRIT SYSTEM UPGRADES

The Camden County Municipal Utilities Authority ("CCMUA") recently closed on a $15,6500,000 loan with the NJ Water Bank to replace critical equipment....

Read More
HO-HO-KUS PFAS WATER TREATMENT SYSTEM

Ho-Ho-Kus Borough recently closed on a $3,700,000 loan with the NJ Water Bank to address excessive levels of PFAS and PFOS that can penetrate the wate...

Read More
RED BANK BOROUGH LEAD SERVICE LINE REPLACEMENT

Red Bank Borough recently closed on an $3,241,647 loan with the NJ Water Bank to identify and replace lead service lines within the borough. The borough aims to identify all unknown service lines by t...

Read More
STONE HARBOR BOROUGH WATER MAIN REPLACEMENT

Stone Harbor Borough recently closed on a $5,943,971 loan with the NJ Water Bank for the replacement of approximately 12,640 linear feet (LF) of undersized and deteriorating 6- and 8-inch diameter asb...

Read More
TRENTON CITY METER REPLACEMENT AND AMI PROJECT

The City of Trenton recently closed on a $20,000,000 loan with the NJ Water Bank to replace all of Trenton Water Works water meters with advanced metering infrastructure ("AMI") over a seven-year peri...

Read More
JERSEY CITY MUA LEAD SERVICE LINE REPLACEMENT LOAN

The Jersey City MUA recently closed on a $311,040 loan with the NJ Water Bank to replace approximately 16,000 lead service lines between 2022 and 2031 to comply with the new Lead and Copper Rule Revis...

Read More
RIDGEWOOD VILLAGE WATER TREATMENT CENTRALIZATION FOR PFAS REMOVAL

Ridgewood Village recently closed on a $10,762,338 loan with the NJ Water Bank to address excessive levels of PFAS, commonly used in a wide range of industrial processes, and found in many consum...

Read More
HADDON HEIGHTS BOROUGH LOAN CLOSING

The Borough of Haddon Heights recently closed on a $471,305 loan with the NJ Water Bank for the preparation of an asset management plan for the borough's sanitary sewer system and the construction of ...

Read More
HOBOKEN CITY WATER MAIN UPGRADES

Hoboken City recently closed on a $8,910,686 loan with the NJ Water Bank to upgrade its watermains. The project includes engineering design, permitting, and construction to replace the existing water ...

Read More
3 4 5 6 7 8 9
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK