FILTER BY TAG

NEWS (2020)

CLINTON TOWN AMP IMPLEMENTATION LOAN CLOSING

Clinton Town recently closed on a $966,537 loan with the NJ Water Bank to implement recommendations from the 2016 Asset Management Plan (AMP). Since 2...

Read More
BOONTON PLANT CENTRIFUGE LOAN CLOSING

The Jersey City Municipal Utilities Authority (JCMUA) recently closed on a $1,458,905 loan with the NJ Water Bank for the installation of a new centri...

Read More
HACKENSACK CITY LOAN CLOSING

The City of Hackensack recently closed on a $5,204,010 loan with the NJ Water Bank to separate the combined sewer on Main Street to facilitate redevel...

Read More
JCMUA WATER MAIN REPLACEMENT LOAN CLOSING

The Jersey City Municipal Utilities Authority (JCMUA) recently closed on a $25,000,000 loan with the NJ Water Bank to replace 28,000 linear feet of existing 6-inch and 8-inch watermains with new pipes...

Read More
BRICK TOWNSHIP MUA LOAN CLOSING

The Brick Township MUA recently closed on a $17,094,937 loan with the NJ Water Bank to integrate a Granular Activated Carbon (GAC) adsorption process into their existing treatment facility for water q...

Read More
CITY OF HACKENSACK LOAN CLOSING

The City of Hackensack recently closed on a $3,921,780 loan with the NJ Transportation Bank for a two-way conversion of Main Street from Atlantic to Mercer and Mercer to Berry. The Streetscape will in...

Read More
BURLINGTON CITY LOAN CLOSING

The City of Burlington recently closed on a $1,012,911 loan with the NJ Water Bank to replace the dual filter media at each of the four filters at the City's water treatment plant. The project also in...

Read More
HOBOKEN CITY ROW GREEN INFRASTRUCTURE

The City of Hoboken recently closed on a $359,344 loan with the NJ Water Bank to construct Four right-of-way green infrastructure facilities recommended by the NJDEP Rebuild by Design Hudson River pro...

Read More
NEW JERSEY AMERICAN WATER LOAN CLOSING

NJ American Water recently closed on a $24,103,961 loan with the NJ Water Bank to upgrade the existing Swimming River Water Treatment Plant (SRWTP). The project includes the addition of a new one-mill...

Read More
WOODBINE LOAN CLOSING

The Borough of Woodbine recently closed on a $5 million loan with the NJ Water Bank to Replace and upgrade major water treatment plant components and install new water mains. In order to comply with t...

Read More
2 3 4 5 6 7 8
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK