October 22nd, 2020 NJIB
SOUTH ORANGE VILLAGE LOAN CLOSINGSouth Orange Village recently closed on a $640,000 loan with the NJ Water Bank to perform emergency repair work to replace piping and valves in the Ne...
Read MoreOctober 21st, 2020 NJWB
SOUTH ORANGE VILLAGE LOAN CLOSINGSouth Orange Village recently closed on a $640,000 loan with the NJ Water Bank to perform emergency repair work to replace piping and valves in the Ne...
Read MoreOctober 20th, 2020 NJWB
CITY OF NEWARK LOAN CLOSINGThe City of Newark recently closed on a $40 million loan with the NJ Water Bank to complete Phase 3 of its lead service line replacement project, repl...
Read MoreOctober 16th, 2020 NJIB
NJ TRANSPORTATION BANK ANNOUNCES RECIPIENTS OF FUND ALLOCATIONS FOR THE SECOND QUARTER OF SFY2021!1. Essex County has been allocated $5,172,537 for County bridge repairs in Harrison, East Newark and Newark. 2. Camden County has been allocated $3,546,114 for the reconstruction of 27th Street C...
October 16th, 2020 NJWB
MEDFORD LAKES LOAN CLOSINGMedford Lakes Borough recently closed on a $6.1 million loan with the NJ Water Bank to rehabilitate and repair its existing sanitary sewage collection system located throughout its services area. The ...
October 15th, 2020 NJWB
GLOUCESTER TOWNSHIP LOAN CLOSINGGloucester Township recently closed on a $767,290 loan with the NJ Water Bank to provide stormwater management along a stream that frequently floods Redwood Street. The flooding not only isolates a sm...
October 15th, 2020 NJWB
LONG BEACH TOWNSHIP LOAN CLOSINGLong Beach Township recently closed on a $4 million loan with the NJ Water Bank. The sanitary sewer pipes are deteriorated and cracking, resulting in significant volumes of groundwater infiltration in...
October 14th, 2020 NJWB
CLINTON TOWN LOAN CLOSINGClinton Town recently closed on a $3.9 million loan with the NJ Water Bank for improvements to the Wastewater Treatment Plant (WWTP) Filter and Residuals Building. The project includes removal and rep...
October 14th, 2020 NJWB
CARTERET BOROUGH LOAN CLOSINGThe Borough of Carteret recently closed on a $4.8 million loan with the NJ Water Bank to rehabilitate the Roosevelt Avenue and Bergen Street Pump Stations. The improvements include the replacement of ...
September 4th, 2020 NJWB
FRANKLIN TOWNSHIP SA LOAN CLOSINGThe Franklin Township Sewerage Authority recently closed on a $4,044,510 loan with the NJ Water Bank for the cleaning and relining of approximately 750 linear feet of existing gravity sanitary sewers,...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600