NJWB June 28th, 2021
Brick Township MUA 008 Loan Closing
The Brick Township MUA recently closed on a $5,442,253 loan with the New Jersey Water Bank to replace undersized water mains in Cedar Park East and West.The existing 2- to 3-inch water mains were installed in 1972 and will be replaced with 6- to 8-inch mains to meet the current NJDEP standards as we