NJWB June 21st, 2019
The City of Elizabeth Loan Closing
The City of Elizabeth closed today on a $5,320,111 construction loan with the NJ Water Bank to rehabilitate and upgrade the South Street Pump Station. Elizabeth City is prone to localized flooding in the areas of 4th Avenue, South Street and South Spring Street due to inadequate capacity within the