NJWB June 23rd, 2021
Brielle Borough 004 Loan Closing
The Brielle Borough MUA recently closed on a $1,677,600 loan with the New Jersey Water Bank to Rehabilitate the Borough's 500,000-gallon steel ground water storage tank at the Union Lane water plant. The existing chlorine gas disinfection system will be replaced with a calcium hypochlorite disinfect