FILTER BY TAG

NEWS (LOAN CLOSING)

FIELDSBORO SANITARY SEWER LINING

Fieldsboro Borough recently closed on a $1,700,000 loan with the NJ Water Bank to line the sanitary sewer. The project scope will include closed circu...

Read More
BERGEN COUNTY UA EDGEWATER WPCF CONVERSION TO LITTLE FERRY WPCF PUMPING STATION

The Bergen County Utilities Authority recently closed on a $75,000,000 loan with the NJ Water Bank to consolidate the Edgewater Little Ferry Service a...

Read More
TWO RIVERS WATER RECLAMATION AUTHORITY NEW MAIN PUMP STATION

Two Rivers Water Reclamation Authority ("TRWRA") recently closed on a $123,272,021 loan with the NJ Water Bank for a new main pump station. The 50-yea...

Read More
RIDGEWOOD PARK VILLAGE LOAN CLOSING

Ridgefield Park Village recently closed on a $8,000,000 loan with the NJ Water Bank to create a Long-Term Control Plan (LTCP) for localized sewer separation. This project will mitigate combined sewer ...

Read More
PRINCETON WITHERSPOON STREET IMPROVEMENTS

Princeton recently closed on an $6,934,000 loan with the NJ Transportation Bank to address pedestrian hazards on Witherspoon Street. Improvements include concrete sidewalks on both sides of the road, ...

Read More
WILLINGBORO TOWNSHIP ROAD ASSET LOAN CLOSING

The Township of Willingboro recently closed on a $3,586,334 loan with the NJ Transportation Bank to improve roadways in the township. RoadBotics is a tool that collects images of road networks, analyz...

Read More
CAMDEN COUNTY MUA TWO LOAN CLOSINGS

The Camden County Municipal Utilities Authority recently closed on two loans for clean water projects totaling $15,972,973. One project financed the purchase of a new portable emergency generator, and...

Read More
GLOUCESTER COUNTY UTILITIES AUTHORITY CHP LOAN CLOSING

The Gloucester County Utilities Authority recently closed on a $13,848,103 loan with the NJ Water Bank to finance a combined heat and power cogeneration system for the anaerobic digesters. Biogas gene...

Read More
EAST ORANGE CITY CROSSINGS AT BRICK CHURCH LOAN

East Orange City recently closed on a $10,500,000 loan with the New Jersey Water Bank for proposed water quality improvements at the Crossings at Brick Church. The site is currently designated as a Br...

Read More
LITTLE FERRY BOROUGH LOAN CLOSING

Little Ferry Borough recently closed on a $1,457,834 loan with the NJ Transportation Bank for Roadway improvements. The project will be designed and managed by Remington Vernick Engineers and construc...

Read More
1 2 3 4 5 6
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK