January 16th, 2024 NJIB
FIELDSBORO SANITARY SEWER LININGFieldsboro Borough recently closed on a $1,700,000 loan with the NJ Water Bank to line the sanitary sewer. The project scope will include closed circu...
Read MoreJanuary 15th, 2024 NJIB
BERGEN COUNTY UA EDGEWATER WPCF CONVERSION TO LITTLE FERRY WPCF PUMPING STATIONThe Bergen County Utilities Authority recently closed on a $75,000,000 loan with the NJ Water Bank to consolidate the Edgewater Little Ferry Service a...
Read MoreJanuary 10th, 2024 NJIB
TWO RIVERS WATER RECLAMATION AUTHORITY NEW MAIN PUMP STATIONTwo Rivers Water Reclamation Authority ("TRWRA") recently closed on a $123,272,021 loan with the NJ Water Bank for a new main pump station. The 50-yea...
Read MoreDecember 20th, 2023 NJIB
RIDGEWOOD PARK VILLAGE LOAN CLOSINGRidgefield Park Village recently closed on a $8,000,000 loan with the NJ Water Bank to create a Long-Term Control Plan (LTCP) for localized sewer separation. This project will mitigate combined sewer ...
December 15th, 2023 NJIB
PRINCETON WITHERSPOON STREET IMPROVEMENTSPrinceton recently closed on an $6,934,000 loan with the NJ Transportation Bank to address pedestrian hazards on Witherspoon Street. Improvements include concrete sidewalks on both sides of the road, ...
December 14th, 2023 NJIB
WILLINGBORO TOWNSHIP ROAD ASSET LOAN CLOSINGThe Township of Willingboro recently closed on a $3,586,334 loan with the NJ Transportation Bank to improve roadways in the township. RoadBotics is a tool that collects images of road networks, analyz...
December 11th, 2023 NJIB
CAMDEN COUNTY MUA TWO LOAN CLOSINGSThe Camden County Municipal Utilities Authority recently closed on two loans for clean water projects totaling $15,972,973. One project financed the purchase of a new portable emergency generator, and...
December 11th, 2023 NJIB
GLOUCESTER COUNTY UTILITIES AUTHORITY CHP LOAN CLOSINGThe Gloucester County Utilities Authority recently closed on a $13,848,103 loan with the NJ Water Bank to finance a combined heat and power cogeneration system for the anaerobic digesters. Biogas gene...
December 11th, 2023 NJIB
EAST ORANGE CITY CROSSINGS AT BRICK CHURCH LOANEast Orange City recently closed on a $10,500,000 loan with the New Jersey Water Bank for proposed water quality improvements at the Crossings at Brick Church. The site is currently designated as a Br...
November 30th, 2023 NJIB
LITTLE FERRY BOROUGH LOAN CLOSINGLittle Ferry Borough recently closed on a $1,457,834 loan with the NJ Transportation Bank for Roadway improvements. The project will be designed and managed by Remington Vernick Engineers and construc...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600