June 25th, 2021 NJIB
HIGHTSTOWN BOROUGH 010 LOANHightstown Borough recently closed on a $1,433,796 loan with the New Jersey Water Bank for Water Main Improvements. The 4-inch water main on Firs...
Read MoreJune 25th, 2021 NJIB
FARMINGDALE BOROUGH LOAN CLOSINGFarmingdale Borough recently closed on a $522,893 loan with the New Jersey Water Bank to paint and repair its water tower. The Borough of Farmingdale ...
Read MoreJune 25th, 2021 NJIB
PERTH AMBOY LOAN CLOSINGThe City of Perth Amboy recently closed on a $1,651,532 loan with the New Jersey Water Bank to paint the backwash tank at the water treatment plant an...
Read MoreJune 24th, 2021 NJIB
OLD BRIDGE MUA LOAN CLOSINGThe Old Bridge MUA recently closed on a $2,700,000 loan with the New Jersey Water Bank to Rehabilitate part of the Authority's Water Distribution System. Many of the 2- and 4-inch cast iron mains...
June 24th, 2021 NJIB
HAMBURG BOROUGH LOAN CLOSINGHamburg Borough recently closed on a $561,016 loan with the New Jersey Water Bank to rehabilitate three water storage tanks. The three cylindrical tanks include one with a 100,000-gallon capacity...
June 24th, 2021 NJIB
ALLENTOWN BOROUGH LOAN CLOSING 004Allentown Borough recently closed on a $1,909,800 loan with the New Jersey Water Bank for site improvements to the water treatment plant. The plant has been in continuous use for over 50 years with tw...
June 23rd, 2021 NJIB
ORANGE CITY WELL 5Orange City Township recently closed on a $750,000 loan with the New Jersey Water Bank to reactivate its existing Well #5 located within the South Mountain Reservation in Millburn Township. Proposed i...
June 23rd, 2021 NJIB
MOORESTOWN TOWNSHIP LOAN CLOSINGMoorestown Township recently closed on a $12,561,168 loan with the New Jersey Water Bank to Rehabilitate and upgrade the existing 2.016 MGD water treatment plant. The scope of work includes the instal...
June 23rd, 2021 NJIB
BRIELLE BOROUGH LOAN CLOSING 004The Brielle Borough MUA recently closed on a $1,677,600 loan with the New Jersey Water Bank to Rehabilitate the Borough's 500,000-gallon steel ground water storage tank at the Union Lane water plant. ...
June 23rd, 2021 NJIB
BRIELLE BOROUGH 005 LOAN CLOSINGThe Brielle Borough MUA recently closed on a $3,532,900 loan with the New Jersey Water Bank to Design and construct a new 300,000-gallon elevated water storage tank in the Borough of Brielle at the Ol...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600