NJWB
October 12th, 2023
PVSC Wallington Pump Station Rehab
The Passaic Valley Sewerage Commission recently closed on a 23,477,201 loan with the NJ Water Bank to rehabilitate the Wallington Pump Station. While interim modifications have been made since its original construction in 1924, the basic structure and facility have remained unchanged for nearly sixt