FILTER BY TAG

NEWS (LOAN CLOSING)

NHSA LOAN CLOSING

The North Hudson Sewer Authority recently closed on a $17,190,137 loan with the NJ Water Bank to divert storm flow from contributing streets on El Dor...

Read More
LIVINGSTON TOWNSHIP LOAN CLOSING

Livingston Township recently closed on three loans with the NJ Water Bank totaling $83,700,000 for the construction of a new PFAS and Dioxane tre...

Read More
JMEUC FLOOD MITIGATION FACILITIES

The Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters l...

Read More
NEWARK CITY PEDDIE CSO IMPROVEMENTS

The City of Newark recently closed on a $3.8 million loan with the NJ Water Bank for the construction of a floatables control netting facility at the Peddie CSO. The project was designed to replace th...

Read More
MOUNT ARLINGTON BOROUGH LOAN CLOSING

Mount Arlington Borough recently closed on two loans with the New Jersey Water Bank. One loan for $479,456 is for the purchase of a street sweeper to improve water quality in the Borough. The street s...

Read More
HIGHLANDS BOROUGH LOAN CLOSING

Highlands Borough recently closed on an $8,329,712 loan with the NJ Water Bank to improve coastal community water quality. The existing sanitary sewer system in the borough consists of vitrified clay ...

Read More
WILLINGBORO MUA PFOS TREATMENT SYSTEM UPGRADE LOAN CLOSING

The Willingboro MUA recently closed on a $6,561,021 loan with the New Jersey Water Bank to upgrade its 2.0 MGD water treatment plant to remove PFOS/PFAS from Well 5A raw water. The upgrade will i...

Read More
STAFFORD TOWNSHIP LOAN CLOSING

Stafford Township recently closed on a $3,575,000 loan with the New Jersey Water Bank to remove and replace approximately 9,200 linear feet of asbestos concrete pipe sanitary sewer mains in the Beach ...

Read More
PVSC PLANTWIDE SCADA IMPROVEMENTS

The Passaic Valley Sewerage Commission recently closed on a $4,120,254 loan with the NJ Water Bank to implement plantwide SCADA improvements. The work involves replacing existing control equipment tha...

Read More
SOUTH ORANGE VILLAGE WATER UTILITY ADVANCED METERING INFRASTRUCTURE

South Orange Village recently closed on a $2.7 million loan with the New Jersey Water Bank to implement Advanced Metering Infrastructure (AMI). Because most of the South Orange Village water meters ar...

Read More
6 7 8 9 10 11 12
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK