March 2nd, 2023 NJIB
NHSA LOAN CLOSINGThe North Hudson Sewer Authority recently closed on a $17,190,137 loan with the NJ Water Bank to divert storm flow from contributing streets on El Dor...
Read MoreFebruary 13th, 2023 NJIB
LIVINGSTON TOWNSHIP LOAN CLOSINGLivingston Township recently closed on three loans with the NJ Water Bank totaling $83,700,000 for the construction of a new PFAS and Dioxane tre...
Read MoreFebruary 7th, 2023 NJIB
JMEUC FLOOD MITIGATION FACILITIESThe Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters l...
Read MoreFebruary 6th, 2023 NJIB
NEWARK CITY PEDDIE CSO IMPROVEMENTSThe City of Newark recently closed on a $3.8 million loan with the NJ Water Bank for the construction of a floatables control netting facility at the Peddie CSO. The project was designed to replace th...
December 20th, 2022 NJIB
MOUNT ARLINGTON BOROUGH LOAN CLOSINGMount Arlington Borough recently closed on two loans with the New Jersey Water Bank. One loan for $479,456 is for the purchase of a street sweeper to improve water quality in the Borough. The street s...
December 12th, 2022 NJIB
HIGHLANDS BOROUGH LOAN CLOSINGHighlands Borough recently closed on an $8,329,712 loan with the NJ Water Bank to improve coastal community water quality. The existing sanitary sewer system in the borough consists of vitrified clay ...
November 11th, 2022 NJIB
WILLINGBORO MUA PFOS TREATMENT SYSTEM UPGRADE LOAN CLOSINGThe Willingboro MUA recently closed on a $6,561,021 loan with the New Jersey Water Bank to upgrade its 2.0 MGD water treatment plant to remove PFOS/PFAS from Well 5A raw water. The upgrade will i...
November 10th, 2022 NJIB
STAFFORD TOWNSHIP LOAN CLOSINGStafford Township recently closed on a $3,575,000 loan with the New Jersey Water Bank to remove and replace approximately 9,200 linear feet of asbestos concrete pipe sanitary sewer mains in the Beach ...
October 31st, 2022 NJIB
PVSC PLANTWIDE SCADA IMPROVEMENTSThe Passaic Valley Sewerage Commission recently closed on a $4,120,254 loan with the NJ Water Bank to implement plantwide SCADA improvements. The work involves replacing existing control equipment tha...
October 10th, 2022 NJIB
SOUTH ORANGE VILLAGE WATER UTILITY ADVANCED METERING INFRASTRUCTURESouth Orange Village recently closed on a $2.7 million loan with the New Jersey Water Bank to implement Advanced Metering Infrastructure (AMI). Because most of the South Orange Village water meters ar...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600