NEWS

ELIZABETH CITY CSO GREEN INFRASTRUCTURE PROJECT

The City of Elizabeth recently completed a Combined Sewer Overflow (CSO) Project that is being funded with approximately $6 million in loans from the ...

Read More
NJ WATER BANK OFFERS PRINCIPAL FORGIVENESS FOR LEAD SERVICE LINE REPLACEMENT PROJECTS

Lead is not normally found in drinking water at the source. Typically, lead gets into drinking water from the service lines, plumbing and fixtures tha...

Read More
THE NJ WATER BANK OFFERS PRINCIPAL FORGIVENESS LOANS FOR CSO ABATEMENT PROJECTS

The management of storm water runoff has become a priority for many communities in New Jersey in recent years due to the increase of and impact from e...

Read More
SCOTCH PLAINS TOWNSHIP LOAN CLOSING

Scotch Plains Township recently closed on a $2.3 Million loan with the NJ Water Bank to rehabilitate two existing raw sewage pump stations. The project includes the replacement of pumping equipment, p...

Read More
NJ WATER BANK OFFERS PRINCIPAL FORGIVENESS FOR CSO ABATEMENT PROJECTS

Some of the most complicated problems with storm water management are Combined Sewer Systems (CSSs). In the late 1800s and early 1900s many cities built CSSs, which at the time provided a contemporary...

Read More
BLOOMFIELD TOWNSHIP LOAN CLOSING

The Township of Bloomfield recently closed on a $67,970 loan with the NJ Water Bank to replace their existing distribution system water meters that have exceeded their useful life with new water servi...

Read More
TWO RIVERS WATER RECLAMATION AUTHORITY LOAN CLOSING

Two Rivers Water Reclamation Authority recently closed on a $2,952,465 loan with the NJ Water Bank to construct a new 54" Pleasure Bay Interceptor. The 48-inch interceptor crossing Pleasure Bay from O...

Read More
LAMBERTVILLE CITY MUA LOAN CLOSING

The City of Lambertville Municipal Utilities Authority recently closed on a $755,810 loan with the NJ Water Bank to rehabilitate their Wastewater Treatment Plant (WWTP). The project includes restoring...

Read More
GLOUCESTER TOWNSHIP LOAN CLOSING

Gloucester Township recently closed on a $927,983 loan with the NJ Water Bank to improve portions of the aging stormwater collection system that have shifted as a result of soil erosion. The deteriora...

Read More
BOROUGH OF ALLENTOWN LOAN CLOSING

The Borough of Allentown recently closed on a $4,600,000 loan with the NJ Water Bank to rehabilitate its Wastewater Treatment Plant (WWTP) which discharges effluent to Doctor's Creek. The proposed pro...

Read More
1 2 3 4 5 6 7 8 9
MENU
NJEIT
NEW JERSEY ENVIRONMENTAL INFRASTRUCTURE TRUST