January 26th, 2024 NJIB
PASSAIC VALLEY SEWERAGE COMMISSION CENTRIFUGEPassaic Valley Sewerage Commission ("PVSC") recently closed on a $22,214,031 loan with the NJ Water Bank to purchase and install a fifth centrifuge. C...
Read MoreJanuary 24th, 2024 NJIB
ELIZABETH CITY SOUTH SECOND STREET DRAINAGE AND ATLANTIC STREET CSO TANK PROJECTElizabeth City recently closed on a $16,500,000 loan with the NJ Water Bank to improve drainage near South Second Street and related improvement at th...
Read MoreNovember 17th, 2023 NJIB
CAMDEN CITY PFAS TREATMENT IMPROVEMENTS AT MORRIS-DELAIR WATER TREATMENT PLANTThe City of Camden recently closed on a $55,000,000 loan with the NJ Water Bank to upgrade its Morris Delair potable drinking water treatment facility...
Read MoreNovember 15th, 2023 NJIB
RUNNEMEDE SANITARY SEWER EXTENSION AND PUMP STATIONRunnemede Borough recently closed on a $7,250,500 loan with the NJ Water Bank to provide wastewater conveyance for approximately 94 residences. Properties on Davis, Evergreen, Sunnybrook, and Sunset R...
October 12th, 2023 NJIB
PVSC WALLINGTON PUMP STATION REHABThe Passaic Valley Sewerage Commission recently closed on a 23,477,201 loan with the NJ Water Bank to rehabilitate the Wallington Pump Station. While interim modifications have been made since its ori...
October 11th, 2023 NJIB
PVSC LINE IMPROVEMENTSThe Passaic Valley Sewerage Commission recently closed on a $20,400,000 loan with the NJ Water Bank to rehabilitate existing sewage conveyance and related infrastructure in need of repair. This projec...
September 27th, 2023 NJIB
STAFFORD TOWNSHIP BEACH HAVEN WEST SEWER REPLACEMENTStafford Township recently closed on a $4,337,001 loan with the NJ Water Bank to remove and replace approximately 10,467 linear feet of Asbestos Concrete Pipe sanitary sewer mains with 10,514 linear f...
August 16th, 2023 NJIB
PLEASANTVILLE CITY SEWER INFRASTRUCTUREPleasantville City recently closed on a $3,200,000 loan with the NJ Water Bank to rehabilitate several sewer mains needing immediate attention on Ridgewood, Bayview, and Decatur Avenues, and Ansley Bo...
July 3rd, 2023 NJIB
ATLANTIC CITY MUA WATER METER AND MTU REPLACEMENTThe Atlantic City MUA ("Authority") recently closed on a $1,955,044 loan with the NJ Water Bank to upgrade or replace approximately 6500 Automatic Meter Readers ("AMR") and Meter Transmission units th...
July 3rd, 2023 NJIB
NEWTON TOWN MEMORY PARK DRAINAGE IMPROVEMENTSNewton Town recently closed on a $981,835 loan with the NJ Water Bank to implement Drainage Improvements for Babe Ruth League Baseball Field in Memory Park. The park lacks proper drainage, resulting i...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600