FILTER BY TAG

NEWS (DISADVANTAGED COMMUNITY)

NJ WATER BANK SURPASSES $1B WATER INFRASTRUCTURE MILESTONE IN SFY2024

The New Jersey Water Bank, a partnership between the New Jersey Department of Environmental Protection and the New Jersey Infrastructure Bank that pro...

Read More
BILLION DOLLAR WATER INFRASTRUCTURE MILESTONE

The New Jersey Water Bank, a partnership between the New Jersey Department of Environmental Protection and the New Jersey Infrastructure Bank that pro...

Read More
TUCKERTON BOROUGH REHABILITATION OF WELL NUMBERS 3 AND 4

Tuckerton Borough recently closed on a $249,568 loan with the NJ Water Bank to rehabilitate Well numbers 3 and 4. The project includes clearing iron b...

Read More
PASSAIC VALLEY SEWERAGE COMMISSION CENTRIFUGE

Passaic Valley Sewerage Commission ("PVSC") recently closed on a $22,214,031 loan with the NJ Water Bank to purchase and install a fifth centrifuge. Centrifugal thickening and dewatering of sewage slu...

Read More
ELIZABETH CITY SOUTH SECOND STREET DRAINAGE AND ATLANTIC STREET CSO TANK PROJECT

Elizabeth City recently closed on a $16,500,000 loan with the NJ Water Bank to improve drainage near South Second Street and related improvement at the intersection of Third Avenue and Atlantic Street...

Read More
CAMDEN CITY PFAS TREATMENT IMPROVEMENTS AT MORRIS-DELAIR WATER TREATMENT PLANT

The City of Camden recently closed on a $55,000,000 loan with the NJ Water Bank to upgrade its Morris Delair potable drinking water treatment facility ("Plant"). Perfluoro octane sulfonic acid (PFOS) ...

Read More
RUNNEMEDE SANITARY SEWER EXTENSION AND PUMP STATION

Runnemede Borough recently closed on a $7,250,500 loan with the NJ Water Bank to provide wastewater conveyance for approximately 94 residences. Properties on Davis, Evergreen, Sunnybrook, and Sunset R...

Read More
PVSC WALLINGTON PUMP STATION REHAB

The Passaic Valley Sewerage Commission recently closed on a 23,477,201 loan with the NJ Water Bank to rehabilitate the Wallington Pump Station. While interim modifications have been made since its ori...

Read More
PVSC LINE IMPROVEMENTS

The Passaic Valley Sewerage Commission recently closed on a $20,400,000 loan with the NJ Water Bank to rehabilitate existing sewage conveyance and related infrastructure in need of repair. This projec...

Read More
STAFFORD TOWNSHIP BEACH HAVEN WEST SEWER REPLACEMENT

Stafford Township recently closed on a $4,337,001 loan with the NJ Water Bank to remove and replace approximately 10,467 linear feet of Asbestos Concrete Pipe sanitary sewer mains with 10,514 linear f...

Read More
1 2 3
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK