July 24th, 2024 NJWB
NJ WATER BANK SURPASSES $1B WATER INFRASTRUCTURE MILESTONE IN SFY2024The New Jersey Water Bank, a partnership between the New Jersey Department of Environmental Protection and the New Jersey Infrastructure Bank that pro...
Read MoreJuly 22nd, 2024 NJWB
BILLION DOLLAR WATER INFRASTRUCTURE MILESTONEThe New Jersey Water Bank, a partnership between the New Jersey Department of Environmental Protection and the New Jersey Infrastructure Bank that pro...
Read MoreJune 4th, 2024 NJWB
TUCKERTON BOROUGH REHABILITATION OF WELL NUMBERS 3 AND 4Tuckerton Borough recently closed on a $249,568 loan with the NJ Water Bank to rehabilitate Well numbers 3 and 4. The project includes clearing iron b...
Read MoreJanuary 26th, 2024 NJIB
PASSAIC VALLEY SEWERAGE COMMISSION CENTRIFUGEPassaic Valley Sewerage Commission ("PVSC") recently closed on a $22,214,031 loan with the NJ Water Bank to purchase and install a fifth centrifuge. Centrifugal thickening and dewatering of sewage slu...
January 24th, 2024 NJIB
ELIZABETH CITY SOUTH SECOND STREET DRAINAGE AND ATLANTIC STREET CSO TANK PROJECTElizabeth City recently closed on a $16,500,000 loan with the NJ Water Bank to improve drainage near South Second Street and related improvement at the intersection of Third Avenue and Atlantic Street...
November 17th, 2023 NJIB
CAMDEN CITY PFAS TREATMENT IMPROVEMENTS AT MORRIS-DELAIR WATER TREATMENT PLANTThe City of Camden recently closed on a $55,000,000 loan with the NJ Water Bank to upgrade its Morris Delair potable drinking water treatment facility ("Plant"). Perfluoro octane sulfonic acid (PFOS) ...
November 15th, 2023 NJIB
RUNNEMEDE SANITARY SEWER EXTENSION AND PUMP STATIONRunnemede Borough recently closed on a $7,250,500 loan with the NJ Water Bank to provide wastewater conveyance for approximately 94 residences. Properties on Davis, Evergreen, Sunnybrook, and Sunset R...
October 12th, 2023 NJIB
PVSC WALLINGTON PUMP STATION REHABThe Passaic Valley Sewerage Commission recently closed on a 23,477,201 loan with the NJ Water Bank to rehabilitate the Wallington Pump Station. While interim modifications have been made since its ori...
October 11th, 2023 NJIB
PVSC LINE IMPROVEMENTSThe Passaic Valley Sewerage Commission recently closed on a $20,400,000 loan with the NJ Water Bank to rehabilitate existing sewage conveyance and related infrastructure in need of repair. This projec...
September 27th, 2023 NJIB
STAFFORD TOWNSHIP BEACH HAVEN WEST SEWER REPLACEMENTStafford Township recently closed on a $4,337,001 loan with the NJ Water Bank to remove and replace approximately 10,467 linear feet of Asbestos Concrete Pipe sanitary sewer mains with 10,514 linear f...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600