November 11th, 2022
WILLINGBORO MUA PFOS TREATMENT SYSTEM UPGRADE LOAN CLOSINGThe Willingboro MUA recently closed on a $6,561,021 oan with the New Jersey Water Bank to upgrade its 2.0 MGD water treatment plant to remove PFOS/PFA...
Read MoreNovember 10th, 2022
STAFFORD TOWNSHIP LOAN CLOSINGStafford Township recently closed on a $3,575,000 loan with the New Jersey Water Bank to remove and replace approximately 9,200 linear feet of asbesto...
Read MoreOctober 31st, 2022
PVSC WEATHERPROOF TUNNEL LOAN CLOSINGThe Passaic Valley Sewerage Commission recently closed on a $5,492,200 loan with the NJ Water Bank to furnish labor, materials, and equipment required...
Read MoreOctober 31st, 2022
PVSC FLOOD WALL LOAN CLOSINGThe Passaic Valley Sewerage Commission recently closed on a $27,855,441 loan to construct a flood wall at the wastewater treatment plant on Wilson Avenue in Newark to protect the plant during extreme ...
October 31st, 2022
PVSC PLANTWIDE SCADA IMPROVEMENTSThe Passaic Valley Sewerage Commission recently closed on a $16,777,280 loan with the NJ Water Bank to implement plantwide SCADA improvements. The work involves replacing existing control equipment th...
October 21st, 2022
SMRSA PUMP STATION UPGRADES - BRIELLE AND GLIMMER GLASSSouth Monmouth Regional Sewerage Authority recently closed on a $1,107,910 loan with the New Jersey Water Bank for rehabilitation and upgrades to the Brielle and Glimmer Glass Pump Stations. Work will...
October 10th, 2022
SOUTH ORANGE VILLAGE WATER UTILITY ADVANCED METERING INFRASTRUCTURESouth Orange Village recently closed on a $2.7 million loan with the New Jersey Water Bank to implement Advanced Metering Infrastructure (AMI). Because most of the South Orange Village water meters ar...
October 6th, 2022
ANNUAL GOVERNOR'S ENVIRONMENTAL EXCELLENCE AWARDSThe awards program is sponsored by the DEP, New Jersey Infrastructure Bank and the New Jersey Corporation for Advanced Technology. Award winners will be honored at a ceremony to be conducted virt...
September 13th, 2022
AFA WATER INFRASTRUCTURE PRESENTATIONAFA Water Infrastructure Event Featuring presentations by Shawn M. LaTourette, Commissioner, NJDEP, George Rolon, COO Water, NJ I-Bank, Oleg Kostin, Director of Operations, NJ American Water, Ray...
September 9th, 2022
PLUMSTED TOWNSHIP ADVANCED WASTEWATER TREATMENT AND COLLECTION SYSTEMPlumsted Township recently completed clean water improvements that are being funded with approximately $23 million in loans from the NJ Water Bank, a joint low-interest rate financing program of the D...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600