FILTER BY TAG

NEWS (LOAN CLOSING)

REHABILITATION OF COMBINED AND STORM SEWER OUTFALLS

Camden City recently closed on a $2,175,071 loan with the NJ Water Bank for the maintenance and rehabilitation of twelve combined sewer outfalls and s...

Read More
TUCKERTON BOROUGH REHABILITATION OF WELL NUMBERS 3 AND 4

Tuckerton Borough recently closed on a $249,568 loan with the NJ Water Bank to rehabilitate Well numbers 3 and 4. The project includes clearing iron b...

Read More
CAMDEN CITY SEWER REPLACEMENT

Camden City recently closed on a $6,550,000 loan with the NJ Water Bank to rehabilitate several deficient sanitary sewer mains at various locations in...

Read More
HIGHTSTOWN BOROUGH IMPROVEMENTS TO HAUSSER AVENUE, BENNETT PLACE AND PROSPECT DRIVE

Hightstown Borough recently closed on a $470,908 loan with the NJ Water Bank to Replace six-inch water mains and fire hydrants on Hausser Avenue, Bennett Place, and Prospect Drive. The water services ...

Read More
HOPEWELL TOWNSHIP LOAN CLOSING

Hopewell Township recently closed on a $122,571 loan with the NJ Water Bank to repair deteriorated sewers. The Hopewell Township Sewer Department operates and maintains two small public sani...

Read More
LAVALLETTE BOROUGH POTABLE WATER SUPPLY REPLACEMENT

Lavallette Borough recently closed on a $3,700,000 loan with the NJ Water Bank to drill a replacement for Well #3 which was originally drilled in 1948 and is currently operating at a reduced capacity....

Read More
HAMBURG BOROUGH SEWER PUMP STATION IMPROVEMENT PROJECT

Hamburg Borough recently closed on a $743,199 loan with the NJ Water Bank to rehabilitate and upgrade its existing sanitary sewer system. The Borough owns, operates, and maintains a sanitary sewerage ...

Read More
MONTGOMERY TOWNSHIP STAGE II WASTEWATER TREATMENT PLANT FLOOD PROTECTION PROJECT

Montgomery Township recently closed on a $17 million loan with the NJ Water Bank to protect the wastewater treatment plant from flooding and improve its resiliency. Various plant components will be re...

Read More
NORTH BERGEN TOWNSHIP LOAN CLOSING

North Bergen Township recently closed on a $4,300,000 loan with the NJ Water Bank for hydraulic analysis to determine the pipe size needed to reduce localized flooding on 85th Street. The sanitary lin...

Read More
JOINT MEETING OF ESSEX AND UNION COUNTIES FLOOD MITIGATION ACOE STORMWATER PUMP STATION

The Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...

Read More
4 5 6 7 8 9 10
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK