FILTER BY TAG

NEWS (LOAN CLOSING)

LAKE STOCKHOLM SYSTEMS, INC. PFAS/PFOS REMOVAL

Lake Stockholm Systems, Inc., recently closed on a $1,687,832 loan with the NJ Water Bank to address excessive levels of per- and polyfluoroalkyl...

Read More
MCUA MAIN TRUNK SEWER & METER CHAMBER REHAB

Middlesex County Utilities Authority ("MCUA") recently closed on an $26,000,000 loan with the NJ Water Bank to rehabilitate part of the Main Trunk Sew...

Read More
BRICK TOWNSHIP MUA SANITARY SEWER MANHOLE REPLACEMENT

The Brick Township MUA recently closed on a $7,581,767 loan with the NJ Water Bank to rehabilitate and/or replace 74 sanitary sewer manholes throughou...

Read More
PASSAIC VALLEY SEWERAGE COMMISSION CENTRIFUGE

Passaic Valley Sewerage Commission ("PVSC") recently closed on a $22,214,031 loan with the NJ Water Bank to purchase and install a fifth centrifuge. Centrifugal thickening and dewatering of sewage slu...

Read More
MUSCONETCONG SEWERAGE AUTHORITY IMPROVEMENTS LOAN CLOSING

The Musconetcong Sewerage Authority("MSA") recently closed on a $2,411,067 loan with the NJ Water Bank for improvements to its wastewater treatment plant, including the replacement of the HVAC systems...

Read More
ELIZABETH CITY SOUTH SECOND STREET DRAINAGE AND ATLANTIC STREET CSO TANK PROJECT

Elizabeth City recently closed on a $16,500,000 loan with the NJ Water Bank to improve drainage near South Second Street and related improvement at the intersection of Third Avenue and Atlantic Street...

Read More
FIELDSBORO SANITARY SEWER LINING

Fieldsboro Borough recently closed on a $1,700,000 loan with the NJ Water Bank to line the sanitary sewer. The project scope will include closed circuit TV and cleaning as needed; approximately 6,700 ...

Read More
BERGEN COUNTY UA EDGEWATER WPCF CONVERSION TO LITTLE FERRY WPCF PUMPING STATION

The Bergen County Utilities Authority recently closed on a $75,000,000 loan with the NJ Water Bank to consolidate the Edgewater Little Ferry Service areas by converting the Edgewater Water Pollution C...

Read More
TWO RIVERS WATER RECLAMATION AUTHORITY NEW MAIN PUMP STATION

Two Rivers Water Reclamation Authority ("TRWRA") recently closed on a $123,272,021 loan with the NJ Water Bank for a new main pump station. The 50-year-old sewer crossing under Pleasure Bay is interna...

Read More
RIDGEWOOD PARK VILLAGE LOAN CLOSING

Ridgefield Park Village recently closed on a $8,000,000 loan with the NJ Water Bank to create a Long-Term Control Plan (LTCP) for localized sewer separation. This project will mitigate combined sewer ...

Read More
1 2 3 4 5
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK